IoTdc Water Management

City of Johannesburg

Savings & Trend Analysis

Track the impact of proactive water management over the last 3 months

Projected Annual Savings

R1.8 million

Based on 17 remediation actions

Loss Recovery Rate31%
Without Action

R1.4 million

Potential revenue loss (3 months)

With Action

R1.0 million

Actual cost incurred (3 months)

You Saved

R446.0k

Net savings (3 months)

The Value of Early Detection

Without this monitoring system, you would have lost R1.4 million in the last 3 months. Thanks to early detection and rapid response, you've saved R446.0k—an average of R26.2k per remediation action.

Cost Trend Analysis

Daily water waste costs: projected vs actual (last 3 months)

Red area = Revenue at risk
Green line = Your protected revenue

Cumulative Monthly Savings

Net savings from remediation actions each month

Total Saved (3 months)R446.0k

Remediation Actions

Actions taken to reduce water loss

Date
Issue & Action
Team
Est. Monthly Savings
26 Dec 2025

High-pressure zone causing micro-leaks

Installed pressure reducing valve

Pipeline SpecialistsR25.7k
25 Dec 2025

Burst main pipe in Orlando West

Emergency shutdown and pipe replacement

Pipeline SpecialistsR14.4k
23 Dec 2025

High-pressure zone causing micro-leaks

Installed pressure reducing valve

Pipeline SpecialistsR16.1k
23 Dec 2025

Corroded service connection

Replaced galvanized pipe with HDPE

Emergency ResponseR6.9k
20 Dec 2025

Multiple household leaks in zone

Community repair program - fixed 12 properties

Emergency ResponseR28.0k
12 Dec 2025

Meter tampering identified

Installed tamper-proof housing and recalibrated

Plumbing Unit AR11.2k
07 Dec 2025

Underground pipe leak detected

Excavated and repaired 50mm PVC joint

Pipeline SpecialistsR5.3k
26 Nov 2025

Fire hydrant leak

Replaced worn seals and repainted hydrant

Infrastructure MaintenanceR23.5k
21 Nov 2025

Valve chamber flooding

Repaired isolation valve and waterproofed chamber

Pipeline SpecialistsR12.9k
14 Nov 2025

Water hammer causing joint failures

Installed surge arrestor at pump station

Infrastructure MaintenanceR22.9k
13 Nov 2025

Underground pipe leak detected

Excavated and repaired 50mm PVC joint

Emergency ResponseR29.0k
12 Nov 2025

Water hammer causing joint failures

Installed surge arrestor at pump station

Plumbing Unit AR6.7k
05 Nov 2025

Burst main pipe in Orlando West

Emergency shutdown and pipe replacement

Infrastructure MaintenanceR9.7k
05 Nov 2025

Water hammer causing joint failures

Installed surge arrestor at pump station

Infrastructure MaintenanceR25.2k
28 Oct 2025

Meter tampering identified

Installed tamper-proof housing and recalibrated

Leak Detection SquadR12.1k
27 Oct 2025

Corroded service connection

Replaced galvanized pipe with HDPE

Pipeline SpecialistsR25.7k
20 Oct 2025

Illegal connection identified

Removed connection and formalized supply

Plumbing Unit AR18.7k
17 actions shown
Total Monthly Savings: R294.0k

Ready to maximize your savings?

Our team can help identify more opportunities for water loss reduction.